Kitchen Remodeling

Kitchen remodeling in Fort Myers & Cape Coral

A kitchen that fits the house you actually have. Most Southwest Florida kitchens were laid out for a different decade — opening one up is usually possible, and we find out what is inside the wall before we quote you.

Timeline
Six to ten weeks on site, with cabinet lead times quoted up front
Permitting
Lee and Collier County filing and inspections handled by us
Pricing
Fixed written scope, named materials, signed change orders only

Services

What a kitchen project includes

  • Finished kitchen with white shaker cabinets, blue-gray glass mosaic backsplash, white quartz counters and stainless appliances

    Cabinets & Storage

    Plywood boxes and humidity-rated finishes as standard. We will tell you when a cheaper line will not survive here.

    Cabinets & Storage
  • Finished kitchen corner with white subway tile on two walls, a granite-topped white shaker cabinet and travertine-look floor tile

    Counters & Backsplash

    Templated after the boxes are set, not before. Quartz, granite and porcelain, seamed where you will not be looking.

    Counters & Backsplash
  • Open-plan kitchen and dining area mid-renovation with a newly drywalled half-wall, skim-coated walls and floor protection down

    Layout Changes

    Moving a sink or range means plumbing, electrical and a permit. We check the wall before promising the island.

    Layout Changes

Reviews

What homeowners say

  • Jennifer Caldwell

    5 out of 5 stars.

    From start to finish Antonio was extremely professional & walked me through making my kitchen not only beautiful but practical. He listened to me and his crew was very skilled and respectful. I am beyond pleased I chose them after seeing the work they had done for a friend. I definitely recommend!

    Jennifer Caldwell, Google review
  • Michael Desbrunes

    5 out of 5 stars.

    I 10/10 would recommend Antonio’s Service, it was Quick and Formal and he was very easy to talk to when explaining how I wanted the kitchen design to look and it came out Exactly how I wanted it!!

    Michael Desbrunes, Google review
  • Rachell Trupke

    5 out of 5 stars.

    We are beyond happy with our complete kitchen remodel! The tile work and flooring look absolutely amazing, and the whole space turned out even better than we imagined. Communication throughout the project was great.

    Rachell Trupke, Google review
  • Anton Ianitchii

    Estero

    5 out of 5 stars.

    Very professional and smooth process. I love it and my wife is extremely happy with the new kitchen especially the new countertop so I can’t thank Tony enough for that. Highly recommend for anyone in Estero!!

    Anton Ianitchii, Google review
  • Damian

    Fort Myers

    5 out of 5 stars.

    I highly recommend if you are in the fort myers area! He did a great job remodeling my kitchen and reconstructing my kitchen layout, i am pleased with the results and look forwards to encouraging other people to get their kitchen remodeled by him!

    Damian, Google review
  • Erik Jose

    Bonita Springs

    5 out of 5 stars.

    He worked on my kitchen in Bonita Springs last week and it came out AMAZING! Definitely recommend him to everyone!

    Erik Jose, Google review
  • Yeslyn Mendoza

    5 out of 5 stars.

    They are very good at what they do. I highly recommend them for kitchen remodeling, they did an excellent job and I’m very happy with the results and quality. They are very hardworking, responsible and reliable in their work. I recommend them!

    Yeslyn Mendoza, Google review
  • Perez Angel

    Naples

    5 out of 5 stars.

    Did a remodel for our kitchen in Naples and turned out amazing

    Perez Angel, Google review
  • Nicole Caldwell

    Estero

    5 out of 5 stars.

    Did a beautiful job!!!! Made my home in Estero enjoyable again. Thank you so much I HIGHLY recommend

    Nicole Caldwell, Google review
  • Dkhijniak

    5 out of 5 stars.

    Had a brand new marble counter top installed with complete appliance and re did my whole pantry.

    Dkhijniak, Google review
  • Omar Vallecio

    5 out of 5 stars.

    They are the best at kitchen remodeling and offer excelente prices i highly recommend them

    Omar Vallecio, Google review
  • Barbara Vazquez

    5 out of 5 stars.

    Great service and open communication

    Barbara Vazquez, Google review

We check the wall before we price the island.

The single most common kitchen quote in this market is wrong because nobody looked. In a slab-on-grade ranch from the 1960s or 1970s, the wall between the kitchen and the living room often carries roof load.

We open a small inspection hole at the walkthrough. If it is structural, you get a price that includes the engineered beam, the header and the permit, instead of a change order in week three.

Included
Inspection hole cut and patched at the walkthrough, no charge
Included
Engineered beam priced up front when the wall is load-bearing
Included
Plumbing and electrical relocation quoted as part of the scope
How we tell a partition from a bearing wall

The reliable indicators are direction and support. A wall running perpendicular to the ceiling joists, sitting above a thickened slab section, or lining up with a beam in the attic is usually carrying load. A wall parallel to the joists with nothing above it usually is not.

None of that is conclusive from the floor, which is why we cut an inspection hole. Ten minutes with a drywall saw and a flashlight answers a question that otherwise costs several thousand dollars to answer during demolition.

When the wall is structural, removal needs an engineered beam sized for the span, a header, posts that carry down to a footing, and a permit with an engineer letter. That is a real line item. It is also usually still worth doing, and knowing the number early is what lets you decide. The same structural questions govern every whole-home remodel we run.

Get a Free Quote

Kitchen soffit stripped to bare drywall with a temporary steel support post in place, original cabinets still hung and new cabinet cartons staged

Cabinets specified for a humid climate.

Particleboard boxes swell here. So do thin veneers and cheap edge banding, especially in a kitchen that runs an ice maker and a dishwasher in a house that sits closed up for the summer.

We spec plywood boxes and humidity-rated finishes as the default, not the upgrade. If you want a budget line we will quote it, and tell you plainly how it will look in four years.

Included
Plywood box construction as standard
Included
Soft-close hardware rated for coastal humidity
Included
Ventilation and make-up air checked against current code

Get a Free Quote

New gray shaker base cabinets set and leveled under a bright bay window, tops open ahead of the countertop template, new plank flooring down

The electrical comes up to code while the walls are open.

A kitchen from before the mid-1990s almost never has enough circuits, and often has no GFCI protection at the counter. Once the drywall is off, bringing it current is inexpensive. Once the tile is on, it is not.

Included
Dedicated small-appliance circuits and GFCI at counter level
Included
Under-cabinet and task lighting run while walls are open
Included
Licensed electrician, permitted and inspected
What the electrical upgrade usually includes

We put the code-required work in the written scope so it is priced, permitted and inspected rather than discovered halfway through. On a typical kitchen from this era that means two dedicated twenty-amp small-appliance circuits, GFCI protection at every counter receptacle, a dedicated circuit for the dishwasher and another for the microwave, and an arc-fault breaker where the panel requires it.

Houses built between roughly 1965 and 1973 sometimes have aluminum branch wiring. It is not inherently dangerous, but every connection needs proper pigtailing with rated connectors, and that is a line item rather than an afterthought. We check the panel at the walkthrough.

Get a Free Quote

Recessed light housings hanging on their wiring above skim-coated walls, an open electrical panel and a taped-off section of new subway tile

Our Work

Recent kitchen remodeling projects

We work across Fort Myers, Cape Coral and Naples, and the surrounding Southwest Florida communities.

View Full Gallery
  • Heavily veined gray granite peninsula with white shaker cabinets, stainless microwave and a window over the double-bowl sink

    Kitchen remodel

  • Completed gray shaker kitchen with speckled granite counters, black gooseneck faucet under a bay window, stainless appliances and gray plank flooring

    Kitchen remodel

  • White quartz peninsula with undermount sink and gooseneck faucet under two pendant lights, open to the adjoining dining room

    Kitchen remodel

Thinking about kitchen remodeling?

A walkthrough and a written estimate cost nothing. You will know within a week what the project actually involves.

Our Process

How the project runs

  1. Walkthrough

    We measure, cut an inspection hole where it matters, and talk through what you want. About an hour, no charge.

  2. Written scope

    Line-by-line pricing with the cabinet line, counter material and tile named specifically.

  3. Permit and build

    We file with the county, order the long-lead items, and run the trades in sequence.

  4. Punch list

    We walk it with you, write down what is not right, and fix it before the final invoice.

Start Your Project

Frequently Asked Questions

How much does a kitchen remodel cost in Fort Myers?

A cosmetic refresh with new counters, backsplash and paint runs in the low tens of thousands. A full gut with new cabinets, relocated plumbing and a removed wall is considerably more. We do not publish one number, because the wall is the variable — the written scope is where your real number lives.

How long will I be without a kitchen?

Six to ten weeks on site. Cabinets are the long pole, typically four to eight weeks from order, so we do not start demolition until they are in the warehouse. Most clients set up a temporary kitchen in the garage.

Do I need a permit for a kitchen remodel in Lee or Collier County?

If you move plumbing, add circuits, or touch a load-bearing wall, yes, in both Lee and Collier County. Replacing cabinets and counters in the same footprint generally does not require one. We tell you which you are at the walkthrough and we file either way.

Can you keep my existing cabinets?

If the boxes are plywood and square, often yes — refacing can be a genuinely good decision. If they are swollen particleboard, no, and we will say so.

Ask Us Directly

Ready when you are.

Send us the room, the rough budget and your timeline. We will tell you honestly whether it is realistic.